NEPRA Approved Net-Metering Regulations
Solar Net-Metering & ROI Calculator
Calculate your recommended rooftop solar system size, installation cost, annual savings, and grid export revenue in Hazara Division.
Monthly Consumption Sizing
650 units
200 kWh1500 kWh3000 kWh
System Size5.5 kW
Required Roof Area440 sq ft
Annual Generation7,920 kWh
Green Meter Requirement: All systems ≥ 3 kW require a bi-directional 3-phase digital meter inspected and calibrated by HAZECO M&T testing division.
Financial Payoff
Estimated Annual Savings
Rs. 273,240 / year
Estimated Turnkey Cost:Rs. 742,500
Estimated Payback Period:2.7 Years
CO2 Emissions Avoided:4594 kg / year